We use cookies to personalize content and ads, and to analyze our traffic and improve our service.
200 MW / 800 MWh
S4 Muntendam is a large-scale HV battery energy storage system in development, designed to relieve grid congestion in the northeast of the Netherlands and support renewable integration, with planned commercial operation in Q1 2028.
10 MW / 47 MWh
S4 Zeeland marks a major milestone for the Dutch energy transition as the first 4-hour grid scale storage project in the country.
From hybrid flywheel storage to a 4-hour BESS, S4 Heerhugowaard delivers next-generation grid flexibility.
7.75 MW / 31 MWh
Strategically located in the heart of the northern energy hub, the S4 Groningen BESS delivers powerful, 4-hour flexibility.
8 MW / 36 MWh
S4 Energy Almelo showcases the evolution from ultra-fast frequency response to long-duration, future-proof grid flexibility.
45 MW / 90 MWh
S4’s first UK high-voltage project, strategically located at 132 kV to deliver high-value grid support, reinforced by strong local O&M capability.
15 MW / 30 MWh
This 15 MW / 30 MWh battery energy storage system in Wittmund (Lower Saxony) is S4 Energy’s first German project to reach “Ready to Build” status after acquiring Terra One’s 310 MW portfolio — a major milestone in S4’s European expansion.
500 MW / 2,000 MWh
150 MW / 300 MWh
A stabilising battery project at a strategic location to address grid congestion in the province of North Holland.